logo

Buried Integrated Sewage Treatment Equipment Structure & Standard Configuration ZQE (Zhongqiao Enlightenment)

Place of Origin:Shandong,China
Brand Name:ZhongQiao Enlightenment
Certification:ISO SGS
Model Number:MBR-3
Minimum Order Quantity:1 Set
Price:12470USD -27800USD
Payment Terms:L/C,D/A,D/P,T/T
Supply Ability:120 Set Per Month
Product Details
Highlight:

Buried Integrated Sewage Treatment Equipment

,

Integrated Wastewater Treatment Equipment Structure

,

Standard Configuration ZQE Sewage Equipment

Installationtype: Modular / Custom-built
Lifespan: 20 To 30 Years
Powersupply: 220V/380V, 50Hz/60Hz
Color: Customized
Weight Of Equipment: 6.15t
Function: Water Purification Plant
Footprint: Depends On Capacity And Technology, E.g., 1,000 M2 For 1000 M3/day
Capacity: Varies (e.g., 5 M3/day To 500 M3/day)
Effluent Quality: Meets Local Discharge Standards (BOD < 20 Mg/L, COD < 50 Mg/L)
Product Description

Our buried integrated sewage treatment equipment adopts an integrated compartmentalized tank structure. The whole tank is divided into independent functional chambers by internal partition plates, and each chamber completes one stage of wastewater treatment. All functional sections are connected by internal pipelines, forming a continuous treatment system without extra on-site tank fabrication. This article introduces the standard internal structure and standard configuration of our buried sewage equipment for your reference.


Buried Integrated Sewage Treatment Equipment Structure & Standard Configuration ZQE (Zhongqiao Enlightenment)



The first compartment is the regulating tank. It balances fluctuating water flow and pollutant concentration from the inlet. A submersible sewage pump is installed here to lift wastewater to the subsequent biochemical section. Liquid level sensors are fitted inside to realize automatic pump control. A coarse filter screen is equipped at the water inlet to intercept large floating debris and protect pumps and pipelines from blockage.


Then comes the anaerobic and anoxic zone. In this area, organic pollutants are decomposed by facultative microorganisms, and denitrification reaction removes total nitrogen. Sludge return pipeline connects the sedimentation chamber back to this zone to maintain suitable sludge concentration. The third chamber is the aerobic biochemical tank, which is the core of the whole equipment. Aeration hoses or fine bubble aeration discs are installed at the tank bottom. Blowers supply oxygen for aerobic microorganisms to degrade COD and BOD, and realize nitrification of ammonia nitrogen.


After biochemical treatment, wastewater flows into the sedimentation chamber for solid-liquid separation. Settled sludge is returned to the front biochemical zone through sludge return pump. Excess sludge is stored in the sludge tank and can be pumped out periodically. The last section is the disinfection tank. We support UV disinfection or chlorine dioxide dosing disinfection to kill bacteria and pathogens before final discharge.


The standard supporting configuration of our buried integrated sewage treatment equipment includes submersible sewage pumps, sludge return pumps, Roots blowers, aeration assemblies, liquid level transmitters, flow meters, PLC control cabinet, touch screen, alarm indicator and all internal connecting pipes and valves. All wetted accessories are anti-corrosion treated to adapt underground humid environment.


We provide multiple optional upgrades on this base configuration. The 4G remote monitoring system is available for remote data viewing and fault alert. Chemical dosing system can be added for enhanced phosphorus removal. Online water quality sensors can monitor COD, ammonia nitrogen and SS in real time. For high groundwater sites, we add anti-floating structure and counterweight design. For cold regions, thermal insulation layers and temperature monitoring components can be installed.



Buried Integrated Sewage Treatment Equipment Structure & Standard Configuration ZQE (Zhongqiao Enlightenment)

All structural welding of steel tank is finished and inspected in our factory. After welding inspection, the tank goes through sandblasting and multi-layer epoxy anti-corrosion coating. FRP tank products are formed by integral winding, with good leak-proof performance. Every finished unit will undergo water leakage test and simulated running test before shipment to avoid structural and functional problems after arriving at your site.


The compact integrated structure reduces the footprint of the whole system. After buried installation, the equipment will not damage the surrounding landscape. The modular design also allows parallel connection of multiple units if you need to expand treatment capacity in the future. Our technical team will mark each pipeline, sensor and cable clearly on the drawing and operation manual to make installation and maintenance easier for your local workers.


If you want to confirm whether our standard structure and configuration match your project requirements, send us your daily water capacity, influent quality and effluent standard. We will adjust the compartment volume and accessory list, and provide you with P&ID drawing and equipment layout.


Buried Integrated Sewage Treatment Equipment Structure & Standard Configuration ZQE (Zhongqiao Enlightenment)

Buried Integrated Sewage Treatment Equipment Structure & Standard Configuration ZQE (Zhongqiao Enlightenment)

Buried Integrated Sewage Treatment Equipment Structure & Standard Configuration ZQE (Zhongqiao Enlightenment)


You May Also Like
Quality Efficient and Stable Zhongqiao Box Integrated Sewage Treatment Equipment for domestic Wastewater treatment factory
video

Efficient and Stable Zhongqiao Box Integrated Sewage Treatment Equipment for domestic Wastewater treatment

Efficient and Stable Zhongqiao Box Integrated Sewage Treatment Equipment for domestic Wastewater treatment Zhongqiao Box Integrated Sewage Treatment Equipment Introduction The Zhongqiao Box series products are high-end series equipment customized according to customer needs. They can be customized ...
Quality Skid Mounted Integrated Containerized Sewage Treatment Plant Equipment MBR System For Municipal Industrial Use factory

Skid Mounted Integrated Containerized Sewage Treatment Plant Equipment MBR System For Municipal Industrial Use

Skid-mounted Container Integrated Sewage Treatment Equipment MBR System for Municipal/Industrial Use Product Overview Container integrated sewage treatment equipment, also known as corrugated board integrated sewage treatment equipment, refers to equipment whose external steel plates are all made of ...
Quality Durability And Corrosion Resistance PP Material Sewage Water Treatment Plant Integrated factory
video

Durability And Corrosion Resistance PP Material Sewage Water Treatment Plant Integrated

Durability and Corrosion Resistance PP Material Integrated Sewage Treatment EquipmentIntroductionPP series integrated sewage treatment equipment, also known as new material integrated sewage treatment equipment, is made of polymer materials. This device is produced through the mold winding ...
Quality Stainless Steel Lamella Sedimentation Tank with 5000 liters Capacity for Easy Maintenance in Wastewater Treatment factory
video

Stainless Steel Lamella Sedimentation Tank with 5000 liters Capacity for Easy Maintenance in Wastewater Treatment

Lamella Sedimentation Tank for industrial wastewater treatment. Features stainless steel construction, 5000L capacity, gravity-based operation, and customizable design. Offers high efficiency with 1.5 m³/m²/hr surface loading, 4-hour retention time, and easy maintenance.
Contact Us
You Can Contact Us At Anytime!