logo

AO process, buried installation, corrosion-resistant PP integrated sewage treatment equipment

Place of Origin:Shandong,China
Brand Name:ZhongQiao Enlightenment
Certification:ISO SGS
Model Number:AO
Minimum Order Quantity:1 Set
Price:4500USD-18400USD
Payment Terms:T/T,D/P,D/A,L/C
Supply Ability:120 Set Per Month
Product Details
Highlight:

buried PP sewage treatment equipment

,

corrosion-resistant PP sewage equipment

,

integrated PP sewage treatment system

Process: AO/AAO/MBR
Operation Type: Fully Automatic
Installationtime: 3 To 6 Months Depending On Capacity
Installationtype: Buried Installation
Lifespan: 20 To 30 Years
Powersupply: Electricity, Solar Power (optional)
Productname: Wastewater Treatment Plant
Treatment Capacity Range: 5-500 M3/day
Maintenancerequirement: Periodic Inspection And Cleaning
Product Description
1. Product Overview
The PP integrated sewage treatment unit manufactured by Shandong Zhongqiao Qidi Environmental Protection Equipment Co., Ltd. uses a polypropylene (PP) tank formed by hot-melt welding of plates with a wall thickness of 14–22 mm. Capacity ranges from 5 to 100 m³/d, and each unit is customised to the project's water quality, flow rate and site conditions. Screening, equalisation, biological reaction, sedimentation and disinfection are integrated into a single tank, and all piping, media, blowers and electrical controls are pre-assembled and wet-tested in the factory. On site, only foundation preparation, hoisting and pipeline connection are required, which shortens civil works by more than half compared with conventional concrete basins. Typical applications include scattered rural domestic sewage, homestay clusters, small communities, scenic-area service zones and low-flow industrial wastewater from food processing and laundries.

AO process, buried installation, corrosion-resistant PP integrated sewage treatment equipment

2. Specifications and Configuration
The standard series is defined by daily capacity: 5, 10, 20, 30, 50, 80 and 100 m³/d, with tank diameters of 1.6–3.2 m, overall lengths of 4.0–9.5 m and installed power of 0.6–12 kW. Blower capacity is selected at an air-to-water ratio of 10–15:1 based on basin volume. With design influent of COD 300–500 mg/L and ammonia nitrogen 30–45 mg/L, effluent consistently meets Grade B of the Discharge Standard of Pollutants for Municipal Wastewater Treatment Plants (GB 18918-2002).
Plate thickness is graded by burial depth and backfill load: 14 mm for shallow burial, 18 mm for standard depth and 22 mm for deep burial or locations beneath vehicle lanes, where internal stiffening rings are added. Flanges, ladders, inspection openings and manholes are configured during tank fabrication so that field cutting never compromises structural strength. For projects with strong diurnal variation, the equalisation volume may be raised to 50 percent of daily flow, or a parallel PP equalisation tank may be added to prevent solids washout during peak hours.
3. AO Biochemical Process
Raw sewage first passes an inlet screen that intercepts plastic bags, hair and fibrous solids, and then enters the equalisation tank. The tank is sized at 30–40 percent of daily flow to dampen morning and evening peaks; pre-aeration mixing prevents settling and odour. A lift pump delivers the wastewater to the anaerobic hydrolysis tank, where, at dissolved oxygen below 0.2 mg/L, facultative microorganisms hydrolyse and acidify macromolecular organics into smaller molecules, breaking refractory structures, improving biodegradability and releasing part of the phosphorus.
The mixture then flows by gravity into the aerobic contact oxidation tank, which is filled with elastic three-dimensional media offering a large specific surface area and rapid biofilm formation. Microporous diffusers at the bottom maintain dissolved oxygen at 2–4 mg/L. The biofilm degrades COD and BOD₅ while oxidising ammonia nitrogen to nitrate, and simultaneous nitrification and denitrification can occur when carbon is sufficient, improving total nitrogen removal. In practice, COD removal normally exceeds 85 percent and ammonia nitrogen removal 80 percent, with no obvious odour in the effluent.
The sludge-water mixture enters an inclined-tube settler inclined at 60 degrees. Part of the settled sludge is returned to the anaerobic tank to maintain biomass, excess sludge is transferred to a sludge tank for periodic off-site disposal, and the supernatant is disinfected by UV before discharge or reuse for irrigation and road washing. Total hydraulic retention time is 12–18 hours, split into 3–4 hours anaerobic, 8–12 hours aerobic and 2–3 hours settling, giving the process strong buffering capacity against shock loads; recovery after a short shutdown or concentration surge normally takes one to two days.
AO process, buried installation, corrosion-resistant PP integrated sewage treatment equipment
4. Buried Installation Method
Buried installation is the standard delivery configuration. The excavation is opened 600–800 mm beyond the tank outline on each side. A 150 mm gravel layer and a 100 mm plain concrete base are placed, with surface levelness controlled within 5 mm. Where groundwater is high, drainage trenches or dewatering wells are installed around the base, and sand ring walls, anti-flotation anchors or ballast are applied after positioning so that an empty tank cannot rise and misalign the piping.
The unit is lifted at four load points and levelled in both directions with a spirit level. Inlet and outlet pipes, aeration lines and cable sleeves are connected to the reserved interfaces and leak-tested, after which medium-coarse sand is backfilled in layers to 300 mm above the tank crown, watered and compacted, and topsoil is restored for landscaping. Inspection openings, observation windows and the control cabinet are extended above grade by 150–200 mm and fitted with protective covers against rainwater inflow. In northern regions the burial depth may be increased according to frost penetration or insulation added to avoid a drop in biological efficiency during winter. A maintenance path should be reserved and heavy vehicles must not drive over the buried tank.
AO process, buried installation, corrosion-resistant PP integrated sewage treatment equipment
5. Product Features and Operating Advantages
The product's advantages centre on corrosion resistance and low maintenance. PP plate resists acid, alkali, salt and grease, so domestic sewage and mildly aggressive industrial wastewater within pH 2–12 cause no tank corrosion, and the rust perforation and leakage typical of carbon steel units do not occur. Welds are air-tightness tested, and the fully sealed structure protects surrounding groundwater and soil. The unit weighs about one third of a carbon steel system of the same capacity, reducing transport and lifting costs and improving performance on soft ground with lower bearing-capacity requirements.
A PLC cabinet switches blowers, lift pumps and return pumps automatically by level and timer, with fault alarms, phase-failure protection and remote signal interfaces for connection to centralised rural sewage supervision platforms, enabling unattended operation. Routine work is limited to a monthly check of diffusers and media scaling, sludge withdrawal every three to six months and an annual blower service. Consumables are few and easy to replace, and power consumption is approximately 0.35–0.6 kWh/m³. Design service life exceeds 15 years under normal conditions, and the tank does not age or crack under backfill and freeze-thaw cycling, giving better whole-life economics than metal tanks that require frequent repair.
AO process, buried installation, corrosion-resistant PP integrated sewage treatment equipment
6. Applications, Customisation and Service
The equipment suits contiguous rural improvement programmes, township clinics and schools, homestays and farm restaurants, highway service areas and toll stations, and small food-processing or laundry wastewater. Shandong Zhongqiao Qidi Environmental Protection Equipment Co., Ltd. provides a full workflow covering water quality testing, process selection, detailed drawings, equipment manufacturing, transport and hoisting, installation supervision, biomass seeding, commissioning and operator training. Effluent limits, tank material, burial depth and control architecture are all customisable. The complete unit carries a 12-month warranty and the tank structure a five-year warranty, together with operation log templates and remote technical support, so that project owners can achieve stable compliance with modest capital input.
7. Selection, Commissioning and Service Commitments
Selection should start from measured data rather than from a nominal population figure. The designer needs average and peak daily flow, hourly peak factor, influent COD, ammonia, grease and pH range, winter water temperature, discharge standard and the elevation of the receiving ditch. A unit chosen only on average flow is frequently undersized for tourist seasons or holiday peaks, when flow may double within a few hours; conversely, excessive margin raises capital cost and can cause low-load operation with poor nitrification. Burial depth must be checked against the groundwater table and the frost line, and the tank must be kept above the seasonal high water level unless anti-flotation measures are designed. Power supply, access for the vacuum tanker, and clearance for future maintenance also belong in the early layout decision, because they determine whether the plant can actually be serviced after backfill.
Commissioning follows a defined sequence. After the leak test and electrical inspection, the tank is filled with clean water to verify level control, pump rotation and blower airflow, then seeded with activated sludge or a commercial culture and brought up on a gradual load ramp over two to three weeks so that the biofilm matures without being washed out. During this period dissolved oxygen, pH, sludge volume and effluent ammonia are monitored daily, and aeration is trimmed once nitrification is established. Handover includes an operating log template, a spare-parts list, a maintenance calendar and operator training on sludge withdrawal, diffuser inspection and alarm handling. Shandong Zhongqiao Qidi Environmental Protection Equipment Co., Ltd. supports remote diagnosis throughout the warranty period and supplies replacement media, diffusers and seals from stock.
8. Delivery, Documentation and Support
Delivery scope covers the complete treatment train, the control cabinet, the interconnecting pipework inside the skid boundary and the anchor or foundation interface drawing. Each unit is hydro-tested before shipment and packed in seaworthy crating with the membrane cassettes, blowers and instruments protected separately, so that a container delivery arrives on site ready for reassembly. Documentation includes general arrangement and process flow drawings, the electrical schematic, material certificates for the PP sheet and welds, an operation and maintenance manual, a commissioning record and a spare-parts list, all supplied in Chinese and English for export projects. Lead time for standard capacities is normally 15 to 25 working days from drawing approval, and site supervision, commissioning and operator training can be scheduled to match the civil works programme. Spare diffusers, seals, float switches and membrane accessories are kept in stock to shorten unplanned downtime.

AO process, buried installation, corrosion-resistant PP integrated sewage treatment equipment

You May Also Like
Quality Efficient and Stable Zhongqiao Box Integrated Sewage Treatment Equipment for domestic Wastewater treatment factory
video

Efficient and Stable Zhongqiao Box Integrated Sewage Treatment Equipment for domestic Wastewater treatment

Efficient and Stable Zhongqiao Box Integrated Sewage Treatment Equipment for domestic Wastewater treatment Zhongqiao Box Integrated Sewage Treatment Equipment Introduction The Zhongqiao Box series products are high-end series equipment customized according to customer needs. They can be customized ...
Quality Skid Mounted Integrated Containerized Sewage Treatment Plant Equipment MBR System For Municipal Industrial Use factory

Skid Mounted Integrated Containerized Sewage Treatment Plant Equipment MBR System For Municipal Industrial Use

Skid-mounted Container Integrated Sewage Treatment Equipment MBR System for Municipal/Industrial Use Product Overview Container integrated sewage treatment equipment, also known as corrugated board integrated sewage treatment equipment, refers to equipment whose external steel plates are all made of ...
Quality Durability And Corrosion Resistance PP Material Sewage Water Treatment Plant Integrated factory
video

Durability And Corrosion Resistance PP Material Sewage Water Treatment Plant Integrated

Durability and Corrosion Resistance PP Material Integrated Sewage Treatment EquipmentIntroductionPP series integrated sewage treatment equipment, also known as new material integrated sewage treatment equipment, is made of polymer materials. This device is produced through the mold winding ...
Quality Stainless Steel Lamella Sedimentation Tank with 5000 liters Capacity for Easy Maintenance in Wastewater Treatment factory
video

Stainless Steel Lamella Sedimentation Tank with 5000 liters Capacity for Easy Maintenance in Wastewater Treatment

Lamella Sedimentation Tank for industrial wastewater treatment. Features stainless steel construction, 5000L capacity, gravity-based operation, and customizable design. Offers high efficiency with 1.5 m³/m²/hr surface loading, 4-hour retention time, and easy maintenance.
Contact Us
You Can Contact Us At Anytime!