logo

A ²/O+MBR process, semi buried installation, impact load resistant PP integrated sewage treatment equipment

Place of Origin:Shandong,China
Brand Name:ZhongQiao Enlightenment
Certification:ISO SGS
Model Number:A ²/O+MBR
Minimum Order Quantity:1 Set
Price:500USD-18400USD
Payment Terms:L/C,D/A,D/P,T/T
Supply Ability:120 Set Per Month
Product Details
Highlight:

PP integrated sewage treatment equipment

,

semi buried PP sewage equipment

,

impact load resistant MBR equipment

Process: A ²/O+MBR
Warranty: 1 Year,2 Years,12 Months
Material: PP
Application: Waste Water Treatment,Sewage Treatment,municipal/industry,petroleum Chemical Papermaking Leather Printing Food And Industry,waste Water Treatment/recycling
Usage: Pure Water Process,school,seawater Ionizer Desalination/drinking Water Treatment Plant,Processing Wastewater,factory Etc.
Capacity: 5-500 M 3 / D
Product Name: Teenwin MBR Wastewater Treatment Plant,full-automation Organic Wastewater Treatment Plant,AKTIFPAK I-WWTP,waste Water Treatment System,security Filter Housing
Type: Screw,waste Dewatering,Intergrative Or Civil Construction,RO Water Treatment Plant,wastewater/sludge Treatment Equipment
Function: School,Water Purification Plant,hospital,animal Farm Etc,Filtering Suspended Matter
Service Life: 30 Years
Operation: 24 Hours Automatic Running,Full Automatic,manual Or Automatic
Product Description
1. Product Overview
For combined wastewater with nitrogen and phosphorus pollutants and pronounced flow variation, Shandong Zhongqiao Qidi Environmental Protection Equipment Co., Ltd. offers the PP-A²/O series. The tank is thermo-formed from thickened PPH polypropylene sheet, 18–25 mm thick, with standard capacities of 20–150 m³/d and modular flanged sections that allow capacity expansion without shutting down the operating train. Screening, equalisation, anaerobic, anoxic, aerobic, secondary settling, disinfection and sludge return are integrated into one vessel. Semi-buried installation keeps the biological zone at a stable temperature while leaving inspection openings, valves and pumps above grade.

A ²/O+MBR process, semi buried installation, impact load resistant PP integrated sewage treatment equipment

2. Specifications and Configuration
The series covers 20, 30, 50, 80, 100 and 150 m³/d, with tank diameters of 2.2–3.6 m, overall lengths of 6.0–12.0 m and installed power of 3.5–18 kW. Design influent is COD 500–900 mg/L, ammonia nitrogen 45–80 mg/L, total nitrogen 50–90 mg/L and total phosphorus 4–8 mg/L. Effluent can meet Grade A or Grade B of GB 18918-2002, or the applicable local rural standard. Wall thickness is graded by burial depth: 18 mm up to 1.5 m, 22 mm for 1.5–2.5 m and 25 mm beyond 2.5 m or beneath vehicle lanes, with circumferential stiffeners in every case.
Internal compartments are fully welded on both sides, and corner braces connect baffles to the shell so that the structure withstands combined hydrostatic and soil loads. Selection is not based on daily flow alone: total nitrogen load and internal recycle ratio must also be checked. Recycle ratio is normally 200–300 percent, and where the carbon-to-nitrogen ratio falls below 4, supplemental carbon or an additional hydrolysis stage is required, otherwise denitrification is clearly limited.
3. A²/O Biochemical Process
After screening, wastewater enters the equalisation tank, where a submersible mixer prevents deposition. A lift pump delivers it to the anaerobic tank, in which phosphate-accumulating organisms release phosphorus and take up volatile fatty acids, preparing for subsequent aerobic uptake; dissolved oxygen is held below 0.2 mg/L with 1.5–2.0 hours retention. The mixture then passes to the anoxic tank, where nitrified liquor from the end of the aerobic zone is returned by a recycle pump. Denitrifiers use organic matter in the raw wastewater as carbon source and reduce nitrate to nitrogen gas. Anoxic retention is 2–3 hours at 0.2–0.5 mg/L dissolved oxygen.
The aerobic zone consists of two cells in series: the first strengthens organic degradation, the second nitrification and phosphorus uptake. Combined media and microporous aeration maintain dissolved oxygen at 2–4 mg/L with 8–12 hours retention, and an internal recycle point at the outlet returns nitrate-rich liquor to the anoxic tank. Secondary settling combines vertical flow with inclined tubes at a surface loading of 0.8–1.2 m³/(m²·h). Part of the sludge returns to the anaerobic tank to maintain biomass, excess sludge goes to a sludge tank, and the supernatant is disinfected with sodium hypochlorite or UV before discharge, removing COD, ammonia, total nitrogen and total phosphorus in one train.
Compared with a conventional AO process, A²/O completes nitrogen and phosphorus removal in a single sludge system through anaerobic, anoxic and aerobic stages in series with nitrified-liquor recycle, avoiding interference between two separate sludge systems. When influent quality fluctuates, stable effluent is maintained simply by adjusting recycle ratio, aeration and chemical dosing rather than modifying basin structures.
A ²/O+MBR process, semi buried installation, impact load resistant PP integrated sewage treatment equipment
4. Semi-Buried Installation Method
In semi-buried installation the lower half of the unit sits in the foundation pit and the upper half remains above grade. The buried section benefits from the thermal inertia of the soil, so winter temperature fluctuation is far smaller than in an above-ground basin and nitrifiers and phosphate-accumulating organisms remain active. The exposed section brings inspection openings, observation windows, return pumps and valve groups above ground, so maintenance and spare-part replacement need no confined-space entry, which improves safety considerably.
A 200 mm reinforced concrete base is cast first, with embedded anchors and pipe sleeves; the unit is set in place and levelled with secondary grouting. Exposed height is normally 0.8–1.2 m, surrounded by a maintenance platform at least 800 mm wide and a ladder. Removable covers and a vent pipe are fitted on the crown, the vent rising 0.5 m above grade with a rain cap. Backfill is placed in compacted layers no thicker than 300 mm, applied symmetrically to avoid one-sided loading and tank distortion. Where groundwater is high, anti-flotation anchors or a ballasted base slab are required, together with drainage blind ditches around the unit.
A ²/O+MBR process, semi buried installation, impact load resistant PP integrated sewage treatment equipment
5. High Shock-Load Performance
Shock-load resistance comes from three levels. Structurally, the thickened PPH shell has high circumferential stiffness, and stiffeners with internal corner braces resist the combined hydrostatic and soil pressure without denting under poor backfill; modular flanged interfaces allow a new train to be bolted to an existing tank, so expansion does not disturb the operating unit. Biologically, combined media carry a high attached biomass and a long food chain, tolerating sudden changes in flow and concentration, while the equalisation volume at 40–50 percent of daily flow and automatic recycle adjustment keep effluent stable even when influent concentration doubles. At the control level, level sensors, dissolved-oxygen probes and flowmeters work with the PLC to raise aeration and recycle ratio automatically under high load and to push warnings to operators through the IoT module.
All-wetted parts are PP, resistant to the salinity and mildly aggressive components of livestock and food-processing wastewater, with no corrosion in long-term service. With the IoT gateway, dissolved oxygen, liquid level, current, cumulative flow and fault codes can be viewed on a mobile device, and historical curves exported for reporting to regulators. Design life is 15–20 years, and sludge production is lower than in conventional activated sludge, reducing the frequency and cost of sludge haulage and disposal.
6. Applications, Customisation and Service
The series suits township clinics, schools and resettlement communities, small slaughterhouses and livestock farms, food and beverage plants, and clusters of farm restaurants and homestays, and can also upgrade existing stations that need higher effluent quality or more capacity. Shandong Zhongqiao Qidi Environmental Protection Equipment Co., Ltd. provides water quality testing, process calculation, tank structural design, modular expansion planning, commissioning and operator training, with optional carbon dosing, chemical phosphorus removal and disinfection packages. The complete unit carries a 12-month warranty, the tank structure a five-year warranty, and a spare-parts list with recommended replacement intervals is supplied for key components.

7. Selection, Commissioning and Service Commitments
A²/O selection must be driven by load rather than flow alone. The designer needs the total nitrogen and total phosphorus loads, the biodegradable carbon available after screening, the alkalinity of the supply, the winter temperature and the required effluent limits, because denitrification consumes roughly 4.6 kg of COD per kg of nitrate removed and nitrification consumes alkalinity. Where the carbon-to-nitrogen ratio is below 4, or where the wastewater is already partly nitrified, a hydrolysis stage or supplemental carbon dosing is necessary; otherwise the anoxic tank becomes a pass-through and total nitrogen compliance is unattainable regardless of tank volume. Recycle ratio, internal return point and mixer sizing are then fixed together, and the equalisation volume is set at 40–50 percent of daily flow for sites with strong seasonal variation.
Commissioning starts with water testing of pumps, valves and the internal recycle line, followed by sludge seeding and a stepwise load increase over three to four weeks. Recycle ratio is raised gradually while nitrate, alkalinity and pH in the anoxic and aerobic zones are tracked, and chemical phosphorus removal is tuned only after biological uptake has stabilised. Operators are trained to read the daily indicators that matter most: dissolved oxygen profile, mixed liquor concentration, sludge return rate, and the appearance of the mixed liquor. Handover includes as-built drawings, a maintenance calendar, a spare-parts list and a dosing calculation sheet. Shandong Zhongqiao Qidi Environmental Protection Equipment Co., Ltd. provides remote support during the warranty period and can supply additional modular trains when a project later requires higher capacity.
8. Delivery, Documentation and Support
Shipment and handover are planned around the site programme. Standard units are assembled and tested as a complete train, then marked with lifting points and centre of gravity, so that a single crane lift places the tank without field welding of the shell. Where access is restricted, flanged modular sections can be delivered separately and assembled on a prepared base. The pre-delivery test records flow, level control, blower airflow, leak tightness and electrical insulation, and a copy travels with the unit as the baseline for site acceptance. Documentation covers general arrangement and process drawings, the electrical schematic, material and weld certificates, the operation and maintenance manual, the commissioning record and the spare-parts list, issued in Chinese and English for overseas projects. Standard lead time is 15 to 25 working days after drawing approval, and supervision, commissioning and operator training are scheduled to match the civil works programme so that the plant is not left idle waiting for a technician.
For wastewater with a carbon-to-nitrogen ratio below 4, an additional hydrolysis-acidification stage or a carbon dosing unit is recommended. When water temperature drops below 10 °C in winter, aerobic retention should be extended by about 20 percent, or burial depth increased to take advantage of ground temperature.

A ²/O+MBR process, semi buried installation, impact load resistant PP integrated sewage treatment equipment
You May Also Like
Quality Efficient and Stable Zhongqiao Box Integrated Sewage Treatment Equipment for domestic Wastewater treatment factory
video

Efficient and Stable Zhongqiao Box Integrated Sewage Treatment Equipment for domestic Wastewater treatment

Efficient and Stable Zhongqiao Box Integrated Sewage Treatment Equipment for domestic Wastewater treatment Zhongqiao Box Integrated Sewage Treatment Equipment Introduction The Zhongqiao Box series products are high-end series equipment customized according to customer needs. They can be customized ...
Quality Skid Mounted Integrated Containerized Sewage Treatment Plant Equipment MBR System For Municipal Industrial Use factory

Skid Mounted Integrated Containerized Sewage Treatment Plant Equipment MBR System For Municipal Industrial Use

Skid-mounted Container Integrated Sewage Treatment Equipment MBR System for Municipal/Industrial Use Product Overview Container integrated sewage treatment equipment, also known as corrugated board integrated sewage treatment equipment, refers to equipment whose external steel plates are all made of ...
Quality Durability And Corrosion Resistance PP Material Sewage Water Treatment Plant Integrated factory
video

Durability And Corrosion Resistance PP Material Sewage Water Treatment Plant Integrated

Durability and Corrosion Resistance PP Material Integrated Sewage Treatment EquipmentIntroductionPP series integrated sewage treatment equipment, also known as new material integrated sewage treatment equipment, is made of polymer materials. This device is produced through the mold winding ...
Quality Stainless Steel Lamella Sedimentation Tank with 5000 liters Capacity for Easy Maintenance in Wastewater Treatment factory
video

Stainless Steel Lamella Sedimentation Tank with 5000 liters Capacity for Easy Maintenance in Wastewater Treatment

Lamella Sedimentation Tank for industrial wastewater treatment. Features stainless steel construction, 5000L capacity, gravity-based operation, and customizable design. Offers high efficiency with 1.5 m³/m²/hr surface loading, 4-hour retention time, and easy maintenance.
Contact Us
You Can Contact Us At Anytime!