logo

Above Ground Installation MBR Sewage Treatment Equipment with Intelligent Operation and Maintenance and MBR Membrane Process

Place of Origin:Shandong,China
Brand Name:ZhongQiao Enlightenment
Certification:ISO SGS
Model Number:MBR
Minimum Order Quantity:1 Set
Price:4500USD-18400USD
Payment Terms:L/C,D/A,D/P,T/T
Supply Ability:120 Set Per Month
Product Details
Highlight:

PP MBR sewage treatment equipment

,

above ground PP sewage equipment

,

intelligent PP sewage treatment equipment

Process: MBR
Warranty: 1 Year
Material: PP
Application: Waste Water Treatment,Sewage Treatment,municipal/industry,petroleum Chemical Papermaking Leather Printing Food And Industry,waste Water Treatment/recycling
Usage: Pure Water Process,school,seawater Ionizer Desalination/drinking Water Treatment Plant,Processing Wastewater,factory Etc.
Capacity: 5-500 M 3 / D
Product Name: Teenwin MBR Wastewater Treatment Plant,full-automation Organic Wastewater Treatment Plant,AKTIFPAK I-WWTP,waste Water Treatment System,security Filter Housing
Type: Screw,waste Dewatering,Intergrative Or Civil Construction,RO Water Treatment Plant,wastewater/sludge Treatment Equipment
Function: School,Water Purification Plant,hospital,animal Farm Etc,Filtering Suspended Matter
Service Life: 30 Years
Control: Automatic Control Box,PLC+Touch Screen,Automatic/Manual
Product Description
1. Product Overview
Where effluent quality, footprint and operational transparency matter most, membrane bioreactor (MBR) technology is the preferred process for packaged plants. The PP-MBR series from Zhongqiao Enlightenment uses a polypropylene tank housing both the membrane tank and the biological compartments, fitted with reinforced hollow-fibre or flat-sheet membranes of 0.1–0.4 μm pore size. Standard capacity is 10–200 m³/d, and effluent directly meets Grade A of GB 18918-2002, suitable for reuse in landscaping, toilet flushing and road washing. Above-ground installation places the membrane tank, permeate pumps, backwash system and smart control cabinet on a steel skid, simplifying observation, maintenance and later expansion.

Above Ground Installation MBR Sewage Treatment Equipment with Intelligent Operation and Maintenance and MBR Membrane Process

2. Specifications and Configuration
Standard capacities are 10, 20, 30, 50, 80, 100, 150 and 200 m³/d, with tank diameters of 2.0–4.0 m, overall lengths of 5.0–13.0 m and installed power of 1.5–30 kW, of which membrane-zone aeration accounts for 50–60 percent of electricity use. Design flux is 15–25 L/(m²·h), and membrane area includes a 15–20 percent margin for peak flow and cleaning intervals. Design influent is COD 400–800 mg/L and ammonia nitrogen 40–70 mg/L, with effluent targets of COD ≤50 mg/L, ammonia ≤5 mg/L, total phosphorus ≤0.5 mg/L and suspended solids ≤10 mg/L. Tank wall thickness is 16–24 mm, the membrane and biological zones are separated by baffles, and dedicated aeration channels at the membrane tank floor maintain cross-flow velocity across the membrane surface.
Membrane area in the specification table is calculated at 15 L/(m²·h) with a 20 percent design margin, but actual selection must account for water temperature, mixed liquor concentration and cleaning regime. Below 12 °C, membrane area should be increased or aeration extended, otherwise flux decay will reduce permeate output below the design duty.

Above Ground Installation MBR Sewage Treatment Equipment with Intelligent Operation and Maintenance and MBR Membrane Process

3. MBR Biological Process
Wastewater passes a fine screen of 1–3 mm aperture before entering the equalisation tank, removing fibres and hair that would otherwise wrap the membrane strands; this step is a precondition for stable MBR operation. A lift pump delivers the flow to the anoxic tank, where return liquor from the membrane tank completes denitrification. The flow then enters the aerobic tank, where microorganisms degrade organics and nitrify ammonia at 2–4 mg/L dissolved oxygen and a mixed liquor concentration of 6–10 g/L. The mixture enters the membrane tank, and permeate is drawn under negative pressure; the membrane pores retain activated sludge, bacteria and macromolecules, producing a clear effluent without secondary clarification or pre-disinfection filtration.
Aeration at the membrane tank floor both supplies oxygen and creates cross-flow shear that suppresses cake-layer build-up. Permeate pumps run on a permeate–backwash–standby cycle, with backwash using permeate or chemical solution. When trans-membrane pressure reaches its set point, chemical cleaning begins: sodium hypochlorite removes organic fouling, followed by citric acid for inorganic scaling, restoring flux. Solids retention time is controlled at 15–25 days, and the high mixed liquor concentration means low excess sludge, roughly 60–70 percent of conventional activated sludge, substantially reducing haulage and disposal costs.
Membrane permeate is disinfected by UV or sodium hypochlorite before discharge or reuse, and a reuse train can add activated carbon adsorption and fine filtration. Total hydraulic retention is 8–12 hours and the footprint is only 50–60 percent of a conventional train, making the series advantageous for tight sites with strict effluent limits, such as scenic areas, hospitals, office buildings and upscale homestays.
Above Ground Installation MBR Sewage Treatment Equipment with Intelligent Operation and Maintenance and MBR Membrane Process
4. Above-Ground Installation Method
In above-ground configuration the unit rests on a concrete strip foundation or steel skid. No pit excavation is needed, civil work is minimal and construction is fast, which suits high-groundwater sites, rock foundations and retrofit projects in existing buildings. After positioning, the unit is welded to embedded parts or fixed with expansion bolts. A 600–800 mm maintenance aisle is left around the tank, and space for lifting membrane cassettes is reserved on the membrane-tank side, at a clear height of at least the cassette length plus 500 mm.
Inlet, permeate, backwash and sludge pipes are grouped along the tank side, with flexible couplings at wall penetrations to limit vibration transfer. Removable covers and observation windows on the membrane tank allow inspection of the membrane surface. An overflow pipe and drain line prevent excessive water levels during storms or permeate interruptions. In winter, insulation or heat tracing is added to the shell to keep tank temperature above 12 °C; in hot southern regions, ventilation and cooling are provided in the control cabinet to prevent inverter over-temperature trips.
Above Ground Installation MBR Sewage Treatment Equipment with Intelligent Operation and Maintenance and MBR Membrane Process
5. Smart Operation and Maintenance
Smart O&M is the defining feature of this series. The cabinet combines a touch screen with a PLC displaying permeate flow, trans-membrane pressure, dissolved oxygen, mixed liquor concentration, liquid level and pump status in real time. Backwash and chemical cleaning prompts are triggered automatically by pressure and operating hours, avoiding manual judgement that often damages membranes. A 4G or Ethernet gateway connects the unit to a cloud platform, so service staff can review multi-site data from a phone or computer, receive fault notifications and adjust permeate cycles and aeration intensity remotely.
Built-in permeate metering and logging export daily and monthly curves of water volume, power and chemical consumption for project acceptance and cost accounting. When permeate output falls below the set value, trans-membrane pressure rises or dissolved oxygen becomes abnormal, the system reduces load automatically and records the event, preventing irreversible membrane fouling. The all-PP tank resists corrosion and introduces no rust contamination, and the integrated membrane and biological compartments reduce connecting pipework and leak points. Design life exceeds 15 years, with membrane cassettes typically replaced after three to five years of service without heavy lifting equipment.
6. Applications, Customisation and Service
The series is suited to scenic areas, hospitals, schools, office buildings, highway service areas, upscale homestays and villa communities that require Grade A effluent or reuse quality, and to advanced treatment of medium- to high-strength organic wastewater from slaughterhouses, food plants and pharmaceutical production. Zhongqiao Enlightenment provides flux calculation, membrane selection, pre-treatment design, installation, commissioning and O&M training, together with cleaning-agent formulations and recommended cleaning intervals. The unit carries a 12-month warranty, membrane cassettes follow the manufacturer's warranty, the tank structure is warranted for five years, and a cloud platform account with remote technical support is delivered with each unit.
7. Selection, Commissioning and Service Commitments
MBR selection depends on flux, not on tank volume alone. The designer must confirm the pre-treatment standard, since fibres and grease reaching the membrane tank cause irreversible entanglement and fouling; a 1–3 mm fine screen and a grease trap where needed are part of the system, not optional extras. Membrane area is calculated from peak flow at the design flux, with a margin for temperature, cleaning downtime and long-term permeability decline, and the aeration blower must be sized for both biological demand and membrane scouring. Permeate pump head, backwash capacity, chemical dosing points and the clear height for cassette lifting all have to be fixed at layout stage, since a tank that cannot be serviced will eventually fail on flux even if the biology is healthy.
Commissioning begins with clean-water testing of the permeate and backwash circuits, followed by sludge seeding and a gradual load ramp while trans-membrane pressure and permeability are logged. Baseline permeability is recorded at the design flux so that later fouling can be judged against a known reference rather than against a guess. Operators are trained on the maintenance logic: when to backwash, when to clean with sodium hypochlorite, when to descale with citric acid, and how to recognise irreversible clogging. Handover includes the commissioning report, permeability baseline, cleaning procedure, spare cassette seals and a cloud platform account. Zhongqiao Enlightenment provides remote monitoring support, annual performance review and membrane replacement planning for the life of the unit.
Above Ground Installation MBR Sewage Treatment Equipment with Intelligent Operation and Maintenance and MBR Membrane Process
8. Delivery, Documentation and Support
Each unit is delivered as a tested package rather than as loose components. The tank, internal baffles, media, diffusers and membrane cassettes are assembled and hydro-tested in the workshop, the control cabinet is functionally checked with simulated signals, and the train is then marked with lifting points, weight and centre of gravity for a single-crane placement. Export packing separates the membrane cassettes, instruments and blowers in protected cases, and flanged modular sections are shipped separately where site access is restricted. Documentation includes general arrangement and process flow drawings, the electrical schematic, PP sheet and weld certificates, the membrane datasheet, an operation and maintenance manual, the commissioning report with the permeability baseline and a spare-parts list, issued in Chinese and English. Standard lead time is 15 to 25 working days after drawing approval, and supervision, commissioning and operator training are scheduled against the civil works programme.

Above Ground Installation MBR Sewage Treatment Equipment with Intelligent Operation and Maintenance and MBR Membrane Process

You May Also Like
Quality Efficient and Stable Zhongqiao Box Integrated Sewage Treatment Equipment for domestic Wastewater treatment factory
video

Efficient and Stable Zhongqiao Box Integrated Sewage Treatment Equipment for domestic Wastewater treatment

Efficient and Stable Zhongqiao Box Integrated Sewage Treatment Equipment for domestic Wastewater treatment Zhongqiao Box Integrated Sewage Treatment Equipment Introduction The Zhongqiao Box series products are high-end series equipment customized according to customer needs. They can be customized ...
Quality Skid Mounted Integrated Containerized Sewage Treatment Plant Equipment MBR System For Municipal Industrial Use factory

Skid Mounted Integrated Containerized Sewage Treatment Plant Equipment MBR System For Municipal Industrial Use

Skid-mounted Container Integrated Sewage Treatment Equipment MBR System for Municipal/Industrial Use Product Overview Container integrated sewage treatment equipment, also known as corrugated board integrated sewage treatment equipment, refers to equipment whose external steel plates are all made of ...
Quality Durability And Corrosion Resistance PP Material Sewage Water Treatment Plant Integrated factory
video

Durability And Corrosion Resistance PP Material Sewage Water Treatment Plant Integrated

Durability and Corrosion Resistance PP Material Integrated Sewage Treatment EquipmentIntroductionPP series integrated sewage treatment equipment, also known as new material integrated sewage treatment equipment, is made of polymer materials. This device is produced through the mold winding ...
Quality Stainless Steel Lamella Sedimentation Tank with 5000 liters Capacity for Easy Maintenance in Wastewater Treatment factory
video

Stainless Steel Lamella Sedimentation Tank with 5000 liters Capacity for Easy Maintenance in Wastewater Treatment

Lamella Sedimentation Tank for industrial wastewater treatment. Features stainless steel construction, 5000L capacity, gravity-based operation, and customizable design. Offers high efficiency with 1.5 m³/m²/hr surface loading, 4-hour retention time, and easy maintenance.
Contact Us
You Can Contact Us At Anytime!