logo

4-300 m³/d Carbon Steel Wastewater Treatment Plant with PLC Automatic Control for Integrated Sewage Treatment Equipment

Place of Origin:Shandong,China
Brand Name:ZhongQiao Enlightenment
Certification:ISO SGS
Model Number:AO
Minimum Order Quantity:1 Set
Price:500USD-18400USD
Payment Terms:L/C,D/A,D/P,T/T
Supply Ability:120 Set Per Month
Product Details
Highlight:

4-300 m³/d Wastewater Treatment Plant

,

Carbon Steel Integrated Sewage Treatment Equipment

,

PLC Automatic Control Wastewater Treatment Plant

Warranty: 1 Year
Material: Carbon Steel
Application: Waste Water Treatment,Sewage Treatment,municipal/industry,petroleum Chemical Papermaking Leather Printing Food And Industry,waste Water Treatment/recycling
Usage: Pure Water Process,school,seawater Ionizer Desalination/drinking Water Treatment Plant,Processing Wastewater,factory Etc.
Capacity: 4-300 M 3 / D
Certification: ISO9001,CE Certificate,SGS/CE/ISO 9001,ISO 9000,SGS
Product Name: Teenwin MBR Wastewater Treatment Plant,full-automation Organic Wastewater Treatment Plant,AKTIFPAK I-WWTP,waste Water Treatment System,security Filter Housing
After-Sales Service Provided: Video Technical Support,Online Support,Free Spare Parts,Field Maintenance And Repair Service,Field Installation
Function: School,Water Purification Plant,hospital,animal Farm Etc,Filtering Suspended Matter
Operation: 24 Hours Automatic Running,Full Automatic,manual Or Automatic
Color: Black,according Customers Demands,As Requested
Size: Up To 12 Meters,1870*730*1170MM,3-15m
Control: Automatic Control Box,PLC+Touch Screen,Automatic/Manual
Product Description

The A/O (anoxic/oxic) integrated wastewater treatment unit is the highest-volume product in domestic sewage treatment: short process train, low capital cost, simple operation, and effluent meeting Grade B discharge — sufficient for connections to municipal sewers, receiving waters or irrigation reuse.

The WSZ range from Zhongqiao Enlightenment covers 5 to 500 m³/day in carbon steel enclosures suitable for buried or above-ground installation, with hydrostatic testing and powered trial running completed before dispatch, leaving only foundations and pipe connections for the site.

For hotels, hospitals and residential estates — the three most common domestic sewage sources — selection differs not in the process but in three things: the flow profile, disinfection requirements and water quality characteristics.

1. Why A/O leads in domestic sewage

The core problem of domestic sewage is organic matter plus nitrogen: COD and BOD need biological degradation, ammonia needs nitrification followed by denitrification. A/O separates the two jobs into two tanks — in the anoxic tank, denitrifiers use the organic carbon in the influent to reduce nitrate in the returned nitrified liquor to nitrogen gas; in the aerobic tank, organics are degraded and ammonia is nitrified.

Pre-denitrification makes full use of the influent carbon, gives a higher total nitrogen removal rate than post-denitrification, and eliminates the cost of an external carbon source.

The trade-off against MBR is equally clear: effluent is settled rather than membrane-filtered, suspended solids sit around 20 mg/L, and the water is not directly reusable for toilet flushing; in exchange there are no membranes, no cleaning chemicals, no replacement budget every five to seven years, and lower specific energy.

Where discharge goes to a sewer, a receiving water body or irrigation, Grade B already complies and membrane investment would be wasted; only reuse or discharge to sensitive waters justifies upgrading to A/O plus MBR.

4-300 m³/d Carbon Steel Wastewater Treatment Plant with PLC Automatic Control for Integrated Sewage Treatment Equipment

2. System architecture
Stage Main equipment Function
Pre-treatment Screen, equalization tank, lifting pumps Traps debris; balances flow and quality
Anoxic tank Submersible mixer, return inlet Denitrification; consumes returned nitrate
Aerobic tank Microporous aeration, composite media, return pump Organic degradation; nitrification
Clarifier Inclined tube or vertical-flow settling, sludge handling Solids separation; sludge return and wastage
Disinfection Sodium hypochlorite dosing or UV Effluent hygiene indicators
Control PLC, level and DO instruments, remote module Automatic operation and fault alarms

Two design details decide actual performance. First, distribution: each compartment has its own distribution system to prevent short-circuiting, raising volume utilization to 89.8 percent, 15 to 20 percent above conventional arrangements.

Second, dual returns: mixed-liquor return and sludge return are separate systems with independently adjustable ratios, so influent swings do not force a compromise between nitrogen removal and biomass retention.

4-300 m³/d Carbon Steel Wastewater Treatment Plant with PLC Automatic Control for Integrated Sewage Treatment Equipment

3. Hotels, hospitals and residences: one process, three duty profiles
Source Flow profile Quality profile Configuration notes
Hotel Fluctuates with occupancy; high holiday peaks Higher detergents, fats and oils; larger phosphorus load Larger equalization, grease trap up front, chemical P removal where needed
Hospital Relatively flat all day; contains disinfectant residues Disinfectant residuals and pathogens Pre-disinfection on campus, longer septic retention, larger contact tank per code
Residential estate Three daily peaks, low overnight Uniform quality, strong flow swings Equalization for peaks, variable-frequency blowers for savings

The hospital case deserves expansion. Medical wastewater must pass pre-disinfection and a septic tank on campus before entering the unit — outside the equipment scope but decisive for selection, because residual chlorine from pre-disinfection inhibits the biological system: at high levels it kills activated sludge, so dechlorination at the inlet or a larger dilution equalization is normally required.

Radioisotope laboratory wastewater must be collected and treated separately and never mixed into the domestic line.

Hotels are dominated by the peak-to-trough ratio: occupancy from 30 to 100 percent can triple the flow, and an equalization tank sized for 4 to 6 hours of daily flow absorbs most of it, while variable-frequency blowers cut energy at low load.

Residential swings are regular — three peaks and one overnight trough — so the control programme can preset blower and return pump stages by time band without relying on live instrumentation.

4-300 m³/d Carbon Steel Wastewater Treatment Plant with PLC Automatic Control for Integrated Sewage Treatment Equipment

4. Effluent quality
Parameter Influent Effluent (Grade B) Note
COD (mg/L) ≤500 ≤60 Covers conventional domestic sewage
BOD₅ (mg/L) ≤350 ≤20 Aerobic retention 6 to 8 hours
Ammonia (mg/L) ≤45 ≤15 Extend retention for winter 8 mg/L compliance
Suspended solids (mg/L) ≤270 ≤20 Clarifier effluent; regular desludging is critical
Total phosphorus (mg/L) ≤5 ≤1 Biological removal limited; chemical dosing where needed
Faecal coliforms — ≤500 per L Compliant after disinfection

The boundary of Grade B should be stated up front: this effluent suits municipal sewers, general receiving waters or agricultural irrigation, not direct reuse for flushing or landscaping. Where the local standard is Grade A or stricter, the process changes to A/O plus MBR or adds fibre disc filtration — same shell, higher footprint and energy.

Obtaining written limits from the local environmental authority before construction matters more than any technical optimisation.

4-300 m³/d Carbon Steel Wastewater Treatment Plant with PLC Automatic Control for Integrated Sewage Treatment Equipment

5. Range and parameters
Model Capacity (m³/d) Dimensions (mm) Operating weight (t) Installed / running power (kW) Cost per m³ (CNY) Footprint (m²)
WSZ-0.5 10 2500×1500×2000 9.15 4.08 / 2.41 1.60 21
WSZ-1 20 5000×1500×2000 17.50 4.08 / 2.41 0.92 26
WSZ-3 70 7000×2500×2500 51.31 6.26 / 3.69 0.46 41
WSZ-4 100 10000×2500×2500 72.98 6.26 / 3.69 0.44 52
WSZ-10 250 24000×2500×2700 (two units) 175.25 15.80 / 9.20 0.43 110
WSZ-20 500 39000×3000×2700 (three units) 349.61 21.70 / 12.70 0.29 193

Above 200 m³/day a single tank exceeds transport limits, so the range switches to parallel units, each with its own blower and return pump, rotating at low load. Parallel layout also simplifies expansion: add one group and the existing system keeps running. For hospital and hotel projects, sizing the enclosure to the planned ultimate flow while operating to the near-term flow is more flexible than one oversized unit.

6. Installation and operation

Buried installation succeeds or fails in the civil interface.

Foundations are designed for operating weight plus cover load with flatness within 3 mm over a 2 m straightedge; high-groundwater sites need an anti-flotation check; after setting, the tank is filled to design level before symmetrical backfill so unilateral soil pressure cannot distort it; ports, vents and sampling points are brought to surface with rain and fall protection.

These conditions belong in the technical annex of the purchase contract, not in site negotiation.

Three operating practices matter most. First, desludging rhythm decides clarifier life — waste sludge once or twice a week, because excess sludge concentration carries solids into the effluent. Second, chlorine dosing follows online residual readings: too much harms the receiving water ecology, too little fails the hygiene indicator.

Third, plan for winter: extend retention or reduce loading before nitrification slows, rather than remedying afterwards. The series holds China Environmental Protection Product Certification (CCAEPIEP-2023-1218), and the company operates certified quality, environmental, occupational health and safety, and energy management systems, providing a direct basis for the technical file required in overseas acceptance.

7. Selection in three steps

Selecting an A/O unit reduces to three moves. Fix the discharge destination first — if Grade B complies, do not buy membranes. Then configure equalization, disinfection and phosphorus removal to the duty profile of the source: hotel, hospital or residence. Finally, size the enclosure to the ultimate flow and run it to the near-term flow.

The product's strength is not any single figure but the fact that design, fabrication, water testing and documentation all happen in the factory, and what the owner receives on site is a connect-and-run unit with complete paperwork, capable of long-term unmanned operation — for hotels, hospitals and estates without dedicated wastewater staff, that is usually the deciding argument.

 4-300 m³/d Carbon Steel Wastewater Treatment Plant with PLC Automatic Control for Integrated Sewage Treatment Equipment

You May Also Like
Quality Efficient and Stable Zhongqiao Box Integrated Sewage Treatment Equipment for domestic Wastewater treatment factory
video

Efficient and Stable Zhongqiao Box Integrated Sewage Treatment Equipment for domestic Wastewater treatment

Efficient and Stable Zhongqiao Box Integrated Sewage Treatment Equipment for domestic Wastewater treatment Zhongqiao Box Integrated Sewage Treatment Equipment Introduction The Zhongqiao Box series products are high-end series equipment customized according to customer needs. They can be customized ...
Quality Skid Mounted Integrated Containerized Sewage Treatment Plant Equipment MBR System For Municipal Industrial Use factory

Skid Mounted Integrated Containerized Sewage Treatment Plant Equipment MBR System For Municipal Industrial Use

Skid-mounted Container Integrated Sewage Treatment Equipment MBR System for Municipal/Industrial Use Product Overview Container integrated sewage treatment equipment, also known as corrugated board integrated sewage treatment equipment, refers to equipment whose external steel plates are all made of ...
Quality Durability And Corrosion Resistance PP Material Sewage Water Treatment Plant Integrated factory
video

Durability And Corrosion Resistance PP Material Sewage Water Treatment Plant Integrated

Durability and Corrosion Resistance PP Material Integrated Sewage Treatment EquipmentIntroductionPP series integrated sewage treatment equipment, also known as new material integrated sewage treatment equipment, is made of polymer materials. This device is produced through the mold winding ...
Quality Stainless Steel Lamella Sedimentation Tank with 5000 liters Capacity for Easy Maintenance in Wastewater Treatment factory
video

Stainless Steel Lamella Sedimentation Tank with 5000 liters Capacity for Easy Maintenance in Wastewater Treatment

Lamella Sedimentation Tank for industrial wastewater treatment. Features stainless steel construction, 5000L capacity, gravity-based operation, and customizable design. Offers high efficiency with 1.5 m³/m²/hr surface loading, 4-hour retention time, and easy maintenance.
Contact Us
You Can Contact Us At Anytime!