Mbr/Mbbr Containerized Sewage Treatment Plant For Residential Areas
mbbr containerized sewage treatment plant
,mbr containerized sewage treatment plant
,mbr containerized wastewater treatment plant
Advanced Mbr/Mbbr High-Quality Waste Water Treatment Equipment for Residential Areas, Integrated Waste Water Treatment
The containerized integrated sewage treatment equipment, also known as corrugated board integrated sewage treatment equipment, features an exterior made entirely of corrugated steel plates. This design offers an attractive appearance and high strength.
The Zhong Qiao Enlightenment containerized integrated sewage treatment equipment has evolved to its third generation after years of development. The four corner columns of the box have also been redesigned from the traditional container construction method, adopting an integrated molding approach. The internal structure of the equipment has been fully integrated with the corrugated board structure based on years of production experience. This includes components such as the internal sludge hopper, distribution system, and weir structures.

- The appearance relies on corrugated plates, offering both aesthetic appeal and high strength.
- Dimensions are not limited to standard container sizes; customization is available with flexible options.
- Treatment units can be designed as single or multiple sets, tailored to site conditions.
- Unrestricted by process constraints, various technologies such as A/O, AA/O, AO+MBR, MBBR, etc., can be used.
- Can be installed either underground or above ground.
- Options are available for including equipment rooms or adjustment tanks.

| model | Water treatment capacity (m³/d) | outline dimension | weight of equipment |
running weight |
installed power | Power consumption |
running expense | running expense | Cable specifications | floor space |
| L x W x H (mm) | (t) | (t) | (kW) | (kW) | (Yuan/ton of water) | (CNY/day) | (mm²) | (m²) | ||
| MBR-0.25 | 5 | 2720×1090×2160 | 1.18 | 7.58 | 5.365 | 3.245 | 4.08 | 20.41 | 2.5 | 19.38 |
| MBR-0.5 | 10 | 3440×1090×2160 | 1.35 | 9.45 | 5.365 | 3.245 | 2.04 | 20.41 | 2.5 | 20.75 |
| MBR-1 | 20 | 3890×1610×2160 | 1.83 | 15.36 | 7.165 | 4.145 | 1.14 | 22.87 | 4 | 24.26 |
| MBR-1.25 | 30 | 5340×1610×2160 | 2.23 | 20.80 | 7.27 | 4.25 | 0.92 | 27.73 | 4 | 28.10 |
| MBR-1.67 | 40 | 4910×2040×2160 | 2.45 | 24.09 | 7.87 | 4.55 | 0.87 | 34.78 | 4 | 31.02 |
| MBR-2 | 50 | 6360×2040×2160 | 3.55 | 31.57 | 7.87 | 4.55 | 0.70 | 34.78 | 4 | 39.97 |
| MBR-2.5 | 60 | 6360×2040×2660 | 4.05 | 38.56 | 7.87 | 4.55 | 0.67 | 40.07 | 4 | 39.97 |
| MBR-3 | 70 | 7090×2040×2660 | 4.36 | 42.83 | 8.63 | 5.31 | 0.57 | 40.07 | 4 | 42.84 |
| MBR-3.5 | 80 | 6890×2540×2660 | 4.91 | 51.46 | 10.23 | 6.11 | 0.58 | 46.12 | 4 | 48.63 |
| MBR-4 | 100 | 8340×2540×2660 | 5.60 | 61.95 | 11.73 | 6.86 | 0.60 | 59.62 | 4 | 53.93 |
| MBR-5 | 120 | 9060×2540×2860 | 6.21 | 72.03 | 13.73 | 7.86 | 0.76 | 91.58 | 6 | 58.51 |
| MBR-6 | 150 | 11230×2540×2860 | 7.62 | 89.20 | 18.82 | 11.07 | 0.61 | 91.58 | 6 | 67.40 |
| MBR-7 | 170 | 10510×2930×2860 | 8.04 | 96.11 | 18.82 | 11.07 | 0.54 | 91.58 | 6 | 70.29 |
| MBR-8 | 200 | 12680×2930×2860 | 9.19 | 115.45 | 21.02 | 12.57 | 0.51 | 101.26 | 10 | 80.65 |
| MBR-10 | 250 | 15580×2930×2860 | 11.16 | 141.72 | 26.07 | 15.27 | 0.51 | 127.18 | 10 | 101.15 |
| MBR-12.5 | 300 | 9780×2930×2860 (in two groups) |
14.49 | 178.40 | 26.25 | 15.45 | 0.45 | 133.63 | 10 | 117.81 |
| MBR-15 | 360 | 11230×2930×2860 (in two groups) |
16.02 | 204.23 | 34.65 | 20.35 | 0.48 | 171.94 | 16 | 131.31 |
| MBR-17 | 400 | 12680×2930×2860 (in two groups) |
17.56 | 230.07 | 35.85 | 21.15 | 0.45 | 179.31 | 16 | 144.30 |
| MBR-20 | 500 | 15580×2930×2860 (in two groups) |
21.45 | 282.56 | 39.45 | 22.95 | 0.36 | 179.31 | 16 | 171.30 |

-
Q: Where is your company? How can I visit there?A: The company is located in Building 10, National Emergency Safety Industrial Park, Wenhua South Road and Chuangzhi Street, Kuiwen District, Weifang City, Shandong Province, China. It is about an hour's drive from Qingdao Airport and Weifang Railway Station. If you need it, we can come and pick you up. Welcome to visit our company.
-
Q: Do you have minimum order quantity request?A: No minimum order, but it can get a discount if you order a large quantity.
-
Q: Do you have certificates?A: Yes,we have ISO,SGS certificate.
-
Q: Can you meet my special requirements for the product?A: Yes,we have a professional design team.We can provide drawings according to your requirements.
-
Q: How to buy your idea products?A: You can provide us your water or waste sources,water or waste quality,flow rate and ground area (connect us for more details) .
-
Q: How to pay?A: T/T and L/C are acceptable and T/T will be more appreciated 70% deposit before producing,30% balance before loading by T/T.
-
Q: What is the delivery time ?A: It depends on order quantities .Generally speaking ,the delivery time will be within 2 to 4 weeks.
-
Q: How to pack the products?A: We use standard package .If you have special package requirements ,we will pack as required ,but the fees will be paid by customers.
-
Q: How do you manufacture your equipment?A: Our machining technology includes laser 1 plasma cutting ,automatic welding, CNC cutting and bending.
Efficient and Stable Zhongqiao Box Integrated Sewage Treatment Equipment for domestic Wastewater treatment
Skid Mounted Integrated Containerized Sewage Treatment Plant Equipment MBR System For Municipal Industrial Use
Durability And Corrosion Resistance PP Material Sewage Water Treatment Plant Integrated